1 November 2025

Three-stage site upgrades

TRL ENGINEERING now offers a 3-stage site upgrade option, that will meet the operational and financial needs of our commercial customers and associate installers and fuels contractors.

TRL can upgrade your underground refuelling facility - tank, line and pump and implement a staged UPSS upgrade with one of our experienced TRL Project Engineers as soon as possible..

STAGE 1 – INSTALL ENGINEERED AND TESTED MANWAY COVERS AND TURRET RISERS + TANK CLEAN

STAGE 2 – INSTALL A NEW DOUBLE WALLED INTANKA SYSTEM INTO THE EXISTING TANK

STAGE 3 – REPLACE PIPEWORK, ELECTRICALS AND PUMPS AND DISTURBED GRADE SURFACES

Manage your budget, and your environmental obligations with us at TRL Engineering.
We are here to assist! No job is too big or too small!

Dan Mulally at his desk

Daniel Mulally
Group General Manager International Operations
E: danm@trlengineering.com.au
M: +61404 044 621

Latest Articles

TRL crew at the Mt Richmond project
Strength Built on Capability, Commitment, and Professionalism

At TRL Engineering, our strength is built on the capability, commitment, and professionalism of our people.

Q1 2026

Building Momentum: TRL Group Delivers a Strong Start to 2026

Dan Mulally at his desk
Welcome Back 2026

It is with great pleasure and pride, that the Senior Management Team welcomes our Managers, Supervisors, Sub-Contractors and Technicians back to work for 2026.